Footpath Resurfacing

We recently carried out work for a local authority to resurface a section of footpath. The path runs between chain link fences leaving a width of only 4 ft. The skid steer machine was able to work on this path and was used to remove the surface layer of wet mud. The machine was then used to import stone which was then graded and compacted using a ride on roller.

Over 100 tons of stone was used on this job.

Comment is closed.