We have recently built and installed a 7m timber bridge, sitting on concrete bank seat pads. The bridge has been designed and installed as part of an ‘easy access’ route which is step free.
Bridge
Posted in : News
Tags :
URL for this post : http://www.gpm-cs.co.uk/bridge/